Distiller Revamping

Target

Revamping of a distillation system

Location

Belgium 

Sector

Life Science 

Duration

12 months

Team

1 Project Manager

2 Automation Engineers  

Project Context

To meet the rising demand for Water for Injection (WFI) at our client's pharmaceutical facility, an upgrade to their existing distillation system was deemed necessary.

The project's goal is to revamp the distiller to guarantee business continuity in WFI production for all operations conducted in a single building over the next 5 to 10 years.

This enhancement is critical for maintaining uninterrupted supply chains and adhering to regulatory standards in pharmaceutical manufacturing.



RealDev's Mission    

RealDev was chosen as Automation Engineering Officeto supervise and implement the upcoming phases of the project:

Detail Design 

  • Replacing and upgrading equipment
  • Revamping 2 electrical cabinets for distillers
  • eDI gap resolution
  • Drafting design documentation

Execution

  • Coordinating the project and integrator activities
  • Supervising the process engineer's tasks
  • Overseeing the SAT and FAT executions
  • Planning activities and ensuring EHS compliance
  • Updating master data

Validation

  • Executing comprehensive testing and validation
  • Supervising the system qualifications post-implementation
  • Ensuring that the project was properly executed and delivered the expected outcome as planned

Thanks to our extensive experience and expertise, RealDev is effectively reinforcing the distillation infrastructure, boosting operational resilience, and elevating data integrity standards, guaranteeing seamless WFI production and enhancing business continuity for the long term.

Want to find out more?

Contact us today to discuss your upcoming project and discover how RealDev can help you achieve your Industry 4.0 ambitions effectively and successfully.  

Distiller Revamping
Younes Boukamher June 11, 2024
Share this post
DeltaV